Wyoming Whiskey was faced with the challenge of deciding whether to add to their current structure by adding another story, or should they look to adding to their facilities by another method. To ascertain if the current structure was sound to add to vertically, James Gores and Associates provided structural analysis. In reviewing the structure, […]
James Gores and Associates was selected by the Wyoming Water Development Commission to prepare a Level II Groundwater Study for the Town of Pavillion. This project will look into the feasibility of another Wind River Formation Well to the north of the Town of Pavillion. As well, the project will determine the most feasible method […]
CLIENT: Cedar Canyons, Inc. DATE: 2018-2021 SERVICES PROVIDED: Cost Estimating Regulatory Agency Coordination Contractor Negotiations NEPA Approval Road & River Crossing Design Cedar Canyons, Inc., was interested in first, obtaining a private inholding in the Shoshone National Forest. To determine if the property was feasible for the intended use, James […]
A lot has changed in Shoshoni in the 28 years when the town last had a level II master plan compiled, back in 1991. The community built a completely new K-12 school. The former school was demolished and the site cleared, as was the eastern block of South Main Street. Some businesses have consolidated, others […]
January 18, 2018 – 10:45 am
CLIENT: Wyoming Water Development Commission DATE: Oct. 2016 – Oct. 2017 SERVICES PROVIDED: Total Engineering Budget: $87,684 Review and Inventory Existing System; Evaluate System Financing; Create GIS and Hydraulic Model; Estimate Population & Growth Demand; Develop Recommendations, and; Provide Final Report. The South Worland Water Users Corporation estimates up to 30 percent of the water […]
January 18, 2018 – 9:35 am
CLIENT: The Curators of the University of Missouri DATE: 2017 SERVICES PROVIDED: Alternatives Study for Camp Operation Total Engineering Budget: $49,126.00 Preliminary & Final Engineering Design Construction Cost: $81,000.00 Construction Contract Documents Construction Observation As a […]
November 8, 2017 – 9:32 am
Expected Project Timeline: Project bidding documents have been submitted to the funding agency for review.
Expected bidding timeline: mid to late October, 2016.