Site Design, including water, sewer, dry utilities, streets, curb and gutter, and sidewalks.
-
Pages
-
Categories
-
Archives
Site Design, including water, sewer, dry utilities, streets, curb and gutter, and sidewalks.
SERVICES PROVIDED: Cost Estimates for Bonding Preliminary Design DEQ Permitting To bring their world-altering energy source manufacturing facility to Wyoming, Inductance Energy asked James Gores and Associates to provide civil engineering services related to wastewater treatment for their facility in northwest Wyoming. The existing facility had a wastewater lagoon that had […]
A lot has changed in Shoshoni in the 28 years when the town last had a level II master plan compiled, back in 1991. The community built a completely new K-12 school. The former school was demolished and the site cleared, as was the eastern block of South Main Street. Some businesses have consolidated, others […]
CLIENT: Wyoming Water Development Commission DATE: Oct. 2016 – Oct. 2017 SERVICES PROVIDED: Total Engineering Budget: $87,684 Review and Inventory Existing System; Evaluate System Financing; Create GIS and Hydraulic Model; Estimate Population & Growth Demand; Develop Recommendations, and; Provide Final Report. The South Worland Water Users Corporation estimates up to 30 percent of the water […]
CLIENT: Town of Meeteetse DATE: October 2017 SERVICES PROVIDED: Total Engineering Budget: $21,288.00 Water Line Extension Design Construction Cost: $87,888.15 Sewer Line […]
CLIENT: The Curators of the University of Missouri DATE: 2017 SERVICES PROVIDED: Alternatives Study for Camp Operation Total Engineering Budget: $49,126.00 Preliminary & Final Engineering Design Construction Cost: $81,000.00 Construction Contract Documents Construction Observation As a […]
In June 2017, the Riverton Valley Irrigation District Canal was overtopped with flood water coming into the canal downstream of the diversion. The canal experienced a total failure in one section, with a new river channel cutting through the canal completely, and running back into the main channel of the Wind River. This left the […]
CLIENT: Town of Meeteetse DATE: 2017 SERVICES PROVIDED: Total Engineering Budget: $32,400 SCADA System Components Construction Cost: $227,470 Tank Vault Upgrades to Meet OSHA Standards Obsolete Plant Technical Equipment Replacement Funding Agency Coordination […]